Golf Course Design Projects

At Creative Golf Design Ltd, under the close supervision of the company director and current President of the EIGCA, Ken Moodie, Steve’s outputs included:

  • Ashford Manor GC:

    survey, detailed design drawings & site supervision for remodelled 7th hole fairway, approach & greenside bunkers

  • Bramall Park GC:

    calculation of quantities for bunker remodelling on 6 holes

  • Chester GC:

    survey & detailed design drawings for new practice area

  • Coombe Hill GC:

    calculation of quantities for bunker remodelling on all 18 holes

  • Flackwell Heath GC:

    contributions to and drafting of course review report & hole-by-hole illustrations. Survey, detailed design drawings & site supervision for remodelled & new 16th hole fairway, approach & greenside bunkers. Survey & detailed drawings for remodelled 5th & 6th green approaches, aprons & bunkers

  • Grassmoor GC:

    course review report & preparation of evidence including masterplan & earthworks drawings in support of a successful planning application for wide-ranging course improvements by landfill

  • Hadley Wood GC:

    survey, detailed design drawings & site supervision for new tees on 6th hole & partial supervision of construction of new tee on the 2nd hole

  • Hazel Grove GC:

    site supervision: 9 holes bunker remodelling

  • Macclesfield GC:

    partial site supervision: new 4th green

  • Newcastle-under-Lyme GC:

    contributions to and drafting of course review report & hole-by-hole illustrations

  • Penwortham GC:

    site supervision: new 8th & 13th greens

  • Sherwood Forest GC:

    contributions to and drafting of course review report & hole-by-hole illustrations

  • South Beds GC:

    contributions to and drafting of course review report & hole-by-hole illustrations. Detailed design drawings for bunker remodelling on all 18 holes

  • Upton-by-Chester GC:

    survey for 18 new greens & calculation of quantities

As a trainee designer with Gaunt & Marnoch, working under the close supervision of both company directors, Steve’s outputs included:

  • Burstwick GC:

    survey tender, services check & preparation of part of Environmental Impact Assessment for new course development

  • Hennerton GC:

    initial meeting with client & proposed preliminary routing for 9 hole extension

  • Pikefold GC:

    proposed preliminary routing for new 9 holes

  • Prestatyn GC:

    proposed course improvements presented to client

  • Silkstone GC:

    proposed preliminary routing for course extension & presentation to client

  • Trentham Park GC:

    bunker review

  • Walmersley GC:

    proposed preliminary routing for 3 new holes